Project Inventory

Campus Strategic Projects & Initiatives Inventory

The purpose of the UTM Strategic Projects & Initiatives Inventory is to provide a centralized and transparent interface for the active and planned projects and initiatives that are key to achieving UTM’s strategic vision and to demonstrate our progress towards our priorities.

What projects and initiatives are included in the inventory?

  • Projects or Initiatives that are scheduled for implementation during the current fiscal year​, AND
  • Projects/initiatives with an implementation timeline of 6 months or longer OR a budget of $50,000 or more​
  • Does not include regular campus operations

How often is the inventory updated?

This inventory will be updated at the start of each term (January, May, September), beginning in May 2023. Completed projects are archived from the Inventory once two terms have passed since completion.

How can I add a project to the inventory?

Each pillar lead will be prompted every quarter to add to, edit, or update their entries. If you feel that something is missing or incorrect, please contact utm.pmo@utoronto.ca for assistance.

To better understand the Inventory, read a PDF overview »

Project/Initiative NameDescriptionSupported Strategic Priorities
(select all that apply)
Leading UnitKey UTM CollaboratorsProject/ Initiative PositionProject/ Initiative Status
MCaPS - Mississauga Capital Projects & Space Implementation of a new process for capital project prioritization and space management•Build Efficient and Sustainable Operations

•Encourage Collaboration and Belonging
FMP CompleteN/A
New Science Building: Transition PlanSpace assignment and usage plan for New Science Building Launch•Empower Research Discovery and Impact
•Build Efficient and Sustainable Operations
•Embrace Our Place
•Encourage Collaboration and Belonging
•Foster Student Success
FMP/OVPP LaunchedDelayed
Capital Project - New Science Building (NSB)Level 3 Capital Project to build the New Science Building•Empower Research Discovery and Impact
•Build Efficient and Sustainable Operations
•Embrace Our Place
•Encourage Collaboration and Belonging
•Foster Student Success
FMP LaunchedDelayed
Sustainability Strategic Plan Objectives [2022-23]Implementation of goals and targets identified in the UTM  Sustainability Strategic Plan in year 2022-23• Build Efficient and Sustainable Operations
• Foster Student Success
• Encourage Collaboration and Belonging
FMP CompleteN/A
Capital Project - Student Services HubLevel 3 Capital Project to build the student services hub in Davis• Build Efficient and Sustainable Operations

• Encourage Collaboration and Belonging

• Foster Student Success
FMPSA&SSLaunchedDelayed
Capital Project - Spigel Hall RenovationLevel 3 Capital Project to renovate Spigel Hall and provide new commissary kitchen and student space
• Build Efficient and Sustainable Operations
• Encourage Collaboration and Belonging
• Foster Student Success
• Truth, Openness, and Reciprocity
FMP

EDIO

SA&SS

HAS

LaunchedDelayed
Capital Project - New Residence BuildLevel 3 Capital Project to build the new residence• Foster Student SuccessFMPSHRLLaunchedOn Track
Capital Project - Central Utilities CUP1 ExpansionLevel 1 Capital Project to expand capacity of Central Utility Plant, providing redundancy and resilience to campus utilities services.• Build Efficient and Sustainable OperationsFMP LaunchedDelayed
Automatic License Plate Recognition SoftwareImplementation of ALPR to modernize the parking permit and usage process• Build Efficient and Sustainable OperationsHosp & Ancill Svs CompleteN/A
I&O - UTM Web Site upgradeDrupal 7 is reaching end-of-life and after Nov 2022 it will no longer be supported and no security updates will be available.
UTM will migrate Drupal 7 to the latest stable version of Drupal 9 to maintain service availability and strengthen UTM's security posture.
All ~100 active sites will be migrated. 
•Build Efficient and Sustainable Operations

•Foster Student Success
I&ITSCommunicationsCompleteN/A
I&O - Deerfield Hall Datacenter UpgradeVirtual Infrastructure Refresh - Migrating to Dell VxRail
Research Storage Refresh - Migrating to HPE Nimble
•Build Efficient and Sustainable Operations

•Empower Research Discovery and Impact
I&ITS CompleteN/A
Infrastructure - Davis Research Centralized Uninterruptible Power Supply (UPS)Delivering uniterruptible power to critical research equipment to protect research and expensive equipment from damage due to power fluctuations and momentary outages
•Empower Research Discovery and Impact
•Build Efficient and Sustainable Operations
FMP LaunchedDelayed
Infrastructure - CUP Medium Voltage (MV) Switchgear UpgradeUpgrading the centralized medium-voltage electrical infrastructure, serving multiple buildings on campus. Scope has been expanded to include the upgrading of cables.•Build Efficient and Sustainable OperationsFMP LaunchedDelayed
Infrastructure - Davis Air Handling Units (L1-L3) UpgradeUpgrading ventiliation and air filtration systems serving the Davis L Block•Build Efficient and Sustainable OperationsFMP LaunchedOn Track
Infrastructure - CCT Building Envelope Restoration Phase IThe first of a multi-phase project to revitalize and reinforce the building envelope, increasing the durability and integrity of the CCT building.•Build Efficient and Sustainable OperationsFMP LaunchedDelayed
Infrastructure - Student Centre Roof Replacement Upgrade the Student Centre roof system to ensure overall building integrity and durability.• Build Efficient and Sustainable OperationsFMPUTMSUCompleteN/A
I&O - 2022-23 Campus Network ImprovementsWireless network modernization via the deployment of Aruba wireless infrastructure.
Enabling an "at home" experience at McLuhan, allowing smart devices to connect.
Support Research and Instruction by enabling virtual network technology between data centres to achieve near zero failover times of key network services.
Migrate access control lists to the next-generation firewall, enabling seamless and timely changes for specialized software and services used in research and teaching.
• Build Efficient and Sustainable Operations

• Empower Research Discovery and Impact

• Foster Student Success
I&ITS CompleteN/A
Information Security - 2022-23 Information Security Program InitiativesDefine and Conduct Risk Assessments
Enhance an already mature risk assessment process and integrate them as early as possible into our project processes.
Working group with UTM procurement to integrate evaluation mechanisms into the RFP process.
Secure the Endpoints
Deployment of a next-generation anti-virus.
Enhancing Endpoint Detection & Response and Managed Detection & Response.
Deployment of native Microsoft 365 security features.
Discover and Remediate Vulnerabilities
Operationalize a custom-built SN application for vulnerability management.
Enhance the vulnerability management program.
Improve vulnerability management life-cycle.
Enhance and improve the capabilities of the next-generation firewall program.
Continued development of best practices and processes for managing exceptions, particularly in the research space.
• Build Efficient and Sustainable Operations

• Empower Research Discovery and Impact

• Foster Student Success
I&ITS CompleteN/A
Climate Positive PlanImplementation of 240 energy conservation measures to help us achieve our 2030 and 2050 greenhouse gas reduction targets

• Foster Student Success

• Build Efficient and Sustainable Operations

FMP LaunchedOn Track
Infrastructure - New Campus IT Fibre Infrastructure Phase 1Installation of new fibre conduit infrastructure to F2 and Schreiberwood sites.• Build Efficient and Sustainable OperationsFMPI&ITSLaunchedCompleted
Transportation Impact Study Continuation of Master Plan project work, due to the pandeic, full transportation study was not concluded.
Forecast and analysis on the five short-term development sites identified in the campus Master Plan, and assessment of the impacts on the campus road network
Pedestrian flow analysis across campus
Static pedestrian analysis for the William G. Davis building
Campus Circulation Sensitivity Testing, including the analysis and testing of additional traffic circulation options 
• Build Efficient and Sustainable OperationsFMP LaunchedDelayed
Sustainability Strategic Plan Objectives [2023-24]Implementation of goals and targets identified in the UTM Sustainability Strategic Plan in year 2023-24• Build Efficient and Sustainable OperationsFMP CompleteN/A
Sustainability Tracking, Assessment and Rating System (STARS) SubmissionCollection of data pertaining to academics, research, engagement and operations and submission of STARS report.

• Build Efficient and Sustainable Operations

• Foster Student Success

FMP CompleteN/A
Information Security - 2023-24 Information Security Program InitiativesRisk Management
Incident Response
End Point Security
Asset Management
Access Control
• Build Efficient and Sustainable Operations

• Empower Research Discovery and Impact

• Foster Student Success
I&ITS LaunchedOn Track
I&O - Aruba Wireless Access Point ReplacementWireless network modernization via the deployment of Aruba wireless infrastructure.• Build Efficient and Sustainable Operations

• Empower Research Discovery and Impact

• Foster Student Success
I&ITSUTSG / EISLaunchedOn Track
I&O - High-Performance Computing Rebuild/GPU CapabilitiesTo modernize and scope the UTM HPC infrastructure to best serve both UTM's current needs as well as future capabilities. This includes a rebuild of the existing infrastructure to modernize Operating Systems and applications and processes which will act as a blueprint for how the New Science Building HPC datacenter will be operationalized.• Empower Research Discovery and Impact
• Encourage Collaboration and Belonging
• Build Efficient and Sustainable Operations
I&ITSOVPRCompleteN/A
Classroom Experience - 2023-24 Classroom UpgradesClassroom projector modernization via deployment of laser projection in classrooms.
Enhance and support classroom experience and instruction in IB classrooms to replace "junior" podiums and standardize the experience of updated podiums and technology.
• Build Efficient and Sustainable Operations
• Build Efficient and Sustainable Operations
• Foster Student Success
I&ITS LaunchedOn Track
Digital Modernization - Absence Declaration Application DevelopmentWorking with UTMOR to develop of a campus-wide Absence Declaration application on the ServiceNow platform, in order to have provide a more common, standardized experience for students and process for departments, and to decommission the legacy Special Consderation Request java app.• Build Efficient and Sustainable Operations

• Encourage Collaboration and Belonging

• Foster Student Success
I&ITSOVPADLaunchedOn Track
I&O - I&ITS Service CatalogueRevitilization of I&ITS' portfolio of services for the UTM community with the aim of providing accurate information, timely responses, and efficient solutions and fulfilment.

The current offerings in the I&ITS Service Catalogue will retired in favour of new and updated services continualy throughout the duration on the initiative.
• Build Efficient and Sustainable Operations

• Encourage Collaboration and Belonging

• Foster Student Success
I&ITS LaunchedOn Track
I&O - 2023-24 Computer Lab RefreshDeploying new computer hardware and software in various labs across campus.• Build Efficient and Sustainable Operations
• Encourage Collaboration and Belonging
• Foster Student Success
I&ITS CompleteN/A
Pre-Engineered BuildingNew building addition on site by the Paleo building and Grounds Building. The project will accommodate Forensic Science Teaching Classroom, Robotics Research garage, CROBE - Center for Robotic Observations of the Biosphere and the Environment
•Empower Research Discovery and Impact
•Build Efficient and Sustainable Operations
•Embrace Our Place
•Encourage Collaboration and Belonging
•Foster Student Success
FMPForensics Science, Biology, and Robotics programsLaunchedDelayed
Climate Positive PlanImplementation of 240 energy conservation measures to help us achieve our 2030 and 2050 greenhouse gas reduction targets
• Foster Student Success
• Build Efficient and Sustainable Operations
FMP LaunchedOn Track
Infrastructure - New Campus IT Fibre Infrastructure Phase 1Installation of new fibre conduit infrastructure to F2 and Schreiberwood sites.• Build Efficient and Sustainable OperationsFMP LaunchedOn Track
Sustainability Strategic Plan Objectives [2024-25]Implementation of goals and targets identified in the UTM Sustainability Strategic Plan in the year 2024-25
• Build Efficient and Sustainable Operations
• Foster Student Success
• Encourage Collaboration and Belonging
FMP LaunchedOn Track
I&O - Summer '24 Computer Lab RefreshDeploying new computer hardware and software in various labs across campus.
• Build Efficient and Sustainable Operations
• Foster Student Success
• Encourage Collaboration and Belonging
I&ITS LaunchedOn Track
Classroom Experience - Summer '24 Classroom Upgrades
Classroom projector modernization via deployment of laser projection in classrooms.
Enhance and support classroom experience and instruction in IB classrooms to replace "junior" podiums and standardize the experience of updated podiums and technology.
• Build Efficient and Sustainable Operations
• Foster Student Success
I&ITS LaunchedOn Track
VoIP Service migration to MS Teams
Microsoft Teams Phone is the University’s new VoIP solution for making and receiving phone calls. Teams Phone has replaced the Communicator 7 soft client application, which is no longer supported.
 
Staff and faculty who have individual VoIP lines will be migrated to Teams Phone in a phased schedule by division/department. The migration to Teams Phone individual VoIP line is expected to be complete in Aug 2024.
 
Teams Phone is primarily for individuals with single VoIP lines. Currently, it is not meant for complex, multi-line calling environments (i.e., hunt groups, call centers, auto-attendant).
While all MS Teams users can currently place calls to other Teams users, Teams Phone will integrate your existing U of T phone number into Teams and enable a dial pad feature, along with other popular VoIP features listed above.
 
The project, pertaining to UTM, will take into consideration the 1300 DIDs (approx.) from various departments which will be migrated to MS TEAMS throughout 2024. (The exception will be centralized or common area numbers that will remain untouched and continue to operate as is, until further notice).
• Build Efficient and Sustainable Operations
• Encourage Collaboration and Belonging
I&ITS LaunchedOn Track

Project/Initiative NameDescriptionSupported Strategic PrioritiesLeading UnitKey UTM CollaboratorsProject/ Initiative PositionProject/ Initiative Status
Plan for of Launch Student Services HubLaunch Student Services Hub in renovated DV space, including relocating Accessibility Services, Career Centre, Centre for Student Engagement, International Education Centre, and Wellness Outreach, along with launching new First Stop desk as centrepiece•Embrace Our Place
•Encourage Collaboration and Belonging
•Foster Student Success
•Build Efficient and Sustainable Operations
Student Affairs FMPCompleteN/A
Modernize U-Pass Shepherd conversion of U-Pass from local card-based to Presto-driven system in partnership with UTMSU, MiWay, Metrolinx•Build Efficient and Sustainable Operations
•Embrace Our Place
•Foster Student Success
Student AffairsUTMSU, UTMAGs LaunchedN/A
Explore SEE access and support program expansion for PDSB priority student populationsUpdate: Maintain SEE Program focus on black-identified students; to add Indigenous students and students with disabilities when further funding and staffing is available•Foster Student Success
•Embrace Our Place
•Encourage Collaboration and Belonging
•Truth, Openness, and Reciprocity
CSE, Student Affairs OVPADLaunchedDelayed
Address residence on-campus housing capacity to meet U of T's first-year housing guarantee Prepare options to address anticipated need for additional residence space to meet U of T's first-year housing guarantee before new residence opensFoster Student SuccessSHRL FMPCompleteN/A
Relocate Health & Counselling Centre to newly renovated spaceRelocate and expand Health & Counselling Centre in DV to accommodate additional staff and student service capacity•Foster Student Success
•Build Efficient and Sustainable Operations
HCC FMPLaunchedOn Hold
Achieve RecZone outdoor fields expansionIncrease outdoor recreation and sport capacity with relocation, conversion and addition of outdoor fields and multi-sport courts•Foster Student Success
•Embrace Our Place
•Build Efficient and Sustainable Operations
RAWC, Student Affairs FMPLaunchedOn Track
MaGrath Valley Townhouse renovationsRefurbish and modernize townhouses

• Build Efficient and Sustainable Operations

• Embrace Our Place

• Encourage Collaboration and Belonging

• Foster Student Success

Student Affairs, SHRLFMPIn-progressOn Track
Open Spigel Hall Phase II (Student space)Increase casual student lounge space and introduce new multipurpose student space
• Embrace Our Place
• Encourage Collaboration and Belonging
• Foster Student Success
Student AffairsFMP, CSE, EDIOLaunchedOn Track

 
Project/Initiative NameDescriptionSupported Strategic Priorities
(select all that apply)
Leading UnitKey UTM CollaboratorsProject/ Initiative PositionProject/ Initiative Status
Teaching LodgeThe UTM Indigenous Table recommended OII-UTM look into seeking the possibility of purchasing and raising a UTM teaching lodge with the UTM IC Tipi. The teaching lodge allows a larger capacity but more opportunities for land-based learning while providing an additional space for UTM Indigenous community to come together and continue to build a robust community.

• Truth, Openness, and Reciprocity

• Foster Student Success

OII-UTMOII, OVPPCompleteN/A
U of T Orange Shirt Day and National Day for Truth and Reconciliation 2023OII-UTM will be supporting this 3rd annual event by actively participating and co-leading the this year's planning committee. This event has been scheduled to take place on September 29th this year with a U of T Indigenous Community Gathering being planned and taking place at Hart House Farm on October 2nd.

• Truth, Openness, and Reciprocity

• Encourage Collaboration and Belonging

U of T OIIOII-UTMCompleteN/A
UTM Library Signage ProjectIn September 2022, the UTM Library approached OII-UTM with a library signage project proposal. The UTM Library grant proposal was inspired by the UTL project for the Indigenous languages welcome signage (https://onesearch.library.utoronto.ca/ilws), and is “dedicated to building and improving relationships with Indigenous communities to better understand our obligations and responsibilities. This project would use the grant to create Indigenous languages welcome signage, as well as an accompanying 3D model(s).

• Truth, Openness, and Reciprocity

• Encourage Collaboration and Belonging

UTM LibraryOII-UTMCompleteN/A
UTM Indigenous Art Installation Project with Studio X & MJ SingletonOII-UTM will be working alongside a student art club known as Studio X and UTM Indigenous Student - MJ Singleton for an art installation project. It is anticipated the art installation will be housed in Maanjiwe nendamowin building next to the Grand Hall on the main floor. The goal of this project is not only to support student success and collaboration through art but to increase Indigenous visibility through art on campus. It is anticipated this project will be completed and launched during the 2024 National Indigenous History Month (June). • Truth, Openness, and ReciprocityOII-UTMStudio XCompleteN/A
UTM 2nd All Nations PowwowThe 2nd Annual All Nations Powwow will be moving forward with an anticipated date in September 2024. Due to the inaugural Powwow's success, the RAWC venue presented capacity limitations and for September 2024 OII-UTM is aiming for an outdoor Powwow at UTM. It is anticipated this year's Powwow will continue to be co-hosted with the Mississaugas of the Credit First Nation and potentially brining in a new partner - the City of Mississauga. 

• Truth, Openness, and Reciprocity

• Embrace Our Place

OII-UTM Not StartedN/A

Project/Initiative NameDescriptionSupported Strategic PrioritiesLeading UnitKey UTM CollaboratorsProject/ Initiative PositionProject/ Initiative Status
Advancing Academic Advising Project (3AP)Project to identify the goal state for academic advising at UTM and develop recommendations and implementation plans for advancing our academic advising program (AAP) from its current state to this goal state.•Build Efficient and Sustainable Operations

•Foster Student Success
OVPPSS&SA, OVPADLaunchedOn Track
Anti-Black Racism Task Force, ImplementationImplementation of the recommendations of the Anti-Black Racism Task force at UTM.•Encourage Collaboration and Belonging

•Truth, Openness, and Reciprocity
OVPPLibrary, Student Affairs, OVPADLaunchedOn Track
UTM Rematriation ProjectAs part of UTM’s ongoing commitment to Truth and Reconciliation, sociology professor Robin Gray has been appointed to advise on a plan for the safekeeping of a collection of Indigenous artifacts now housed in UTM's Department of Anthropology. The plan will center Indigenous protocols and laws and confront colonial harms, recognizing the urgency of reconnecting Indigenous people with these cultural heritage materials too long held institutionally.•Embrace Our PlaceOVPP LaunchedOn Hold
New Science Building: Transition PlanSpace assignment and usage plan for New Science Building Launch•Empower Research Discovery and Impact
•Build Efficient and Sustainable Operations
•Embrace Our Place
•Encourage Collaboration and Belonging
•Foster Student Success
FMP & OVPPOVPADLaunchedOn Track
City of Mississauga CollaborationsEnhance and expand collaboration with the City of Mississauga focusing on city building through research, economic development and entrepreneurship, talent, sustainability, truth and reconciliation among other themes. •Embrace Our Place
•Empower Research Discovery and Impact
•Foster Student Success
OVPPOVPR, OVPAD, CAO, Student Affairs, iCube, LibraryLaunchedOn Track
Academic Integrity Offence Process Improvement ProjectIdentify opportunities to increase efficiencies in the academic offences process through more standardized and streamlined workflow, while prioritizing timely case resolution. The aim is a result of fewer than 37.9% of cases resolved in more than 6 months from the date of offence. Recommend solutions for implementation post-project. • Build Efficient and Sustainable Operations
• Foster Student Success
• Encourage Collaboration and Belonging
PMOAIUCompleteN/A

Project/Initiative NameDescriptionSupported Strategic PrioritiesLeading UnitKey UTM CollaboratorsProject/ Initiative PositionProject/ Initiative Status
Community Engagement InventoryAn online, up-to-date inventory of all UTM's partners in the private, public, and non-profit sectors. This will be shared in order to leverage our capacity and connections.•Foster Student Success

•Embrace Our Place
EEUCSE & Student AffairsLaunchedDelayed
TA Process Improvement ProjectImplementing process improvements following review.•Foster Student Success

•Build Efficient and Sustainable Operations
APP&RBPFLaunchedDelayed
Department of CPS Lab Improvement Project Implementing process improvements following review.•Foster Student Success

•Build Efficient and Sustainable Operations
CPS; SI; HR CompleteN/A
Student Academic Success (SAS) Project at UTMIncorporate SAS Data use and analysis across UTM at the level of the academic units and to empower academic and non-academic units with user-friendly tools to support strategic planning and broader objectives, as well as to develop a thriving Community of Practice. •Foster Student Success

•Build Efficient and Sustainable Operations
APP&R LaunchedOn Track
Provostial Review of UTMPrepare the report; organize and host evaluation; prepare response and action plan.•Build Efficient and Sustainable Operations
•Embrace Our Place
•Empower Research Discovery and Impact
•Encourage Collaboration and Belonging
•Foster Student Success
•Truth, Openness, and Reciprocity
ODAll PillarsLaunchedOn Track
Launch of the STEM Scholarship Program PilotUndergraduate Scholarship Program designed to support Black students from Peel Region and motivate them to pursue graduate studies in STEM.• Empower Research Discovery and Impact
• Foster Student Success
• Embrace Our Place
EEU/ VDAECPS, OR, CSECompleteN/A

Project/Initiative Name
Description
Supported Strategic Priorities
Leading Unit
Key UTM Collaborators
Project/ Initiative Position
Project/ Initiative Status
SpinUpRecognizing the urgent need to support spin-offs during the challenging inflection point where innovations are being translated from academic labs into companies, the OVPR presents SpinUp@UTM, U of T’s first lab-based venture incubator. With SpinUp@UTM in place, life science companies spinning out of U of T will gain affordable access to lab space, equipment, training, and programming, and the UTM community will gain research partnerships, trainee experiential learning opportunities, and other benefits.• Empower Research Discovery and ImpactOVPROVPP, CAO (FMP), UTM CommunicationsLaunchedOn Track
Modernization of Growth FacilitiesThis initiative supports the modernization of eight growth chambers, located in Davis Building, into reliable and sustainable research equipment shared by 29 principal investigators and 100+ undergraduate and graduate researchers. 

•  Empower Research Discovery and Impact

• Build Efficient and Sustainable Operations
OVPRCAO (FMP)LaunchedOn Track

At this time, for all other portfolios across UTM, there are currently no projects meeting the criteria for inclusion in this inventory to share.