WHAT:  

Bridge Rehabilitation Construction at Burnhamthorpe Road West, east of Mississauga Road over the Credit River

 

WHEN:  Stage Three Construction begins August 1, 2024 to December 31, 2024

 

TIME:  

Monday to Friday, 7AM-7PM

Weekend work will take place on an as-needed basis

 

HOW THIS WILL IMPACT YOU:

 

Travelers along Burnhamthorpe Road West should anticipate construction-related dust, noise and traffic delays.  Access for emergency vehicles will be maintained.

We appreciate your patience and cooperation.

 

The City of Mississauga’s Construction Notice is attached, including a detailed map of the lane closures and detours.

 

Stage Three Construction:

•             The third stage will re-open the north bridge and north sidewalk/multi-use trail

•             The third stage will close the south bridge and south sidewalk

•             Both eastbound and westbound lanes will be maintained at one (1) lane each direction.  Traffic control signage will indicate a reduction in driving speed.

 

Vehicle, Cyclist and Pedestrian Access:

 

Roads: The vehicle lanes on the south bridge will be closed.  One westbound and one eastbound lane will be maintained on the north bridge via a crossover traffic detour.  Road users should expect delays.  Please follow traffic control signage posted on site.   

 

Sidewalks: The south sidewalk will be closed.  Please use the north sidewalk and multi-use trail instead.  

 

Trail: The Culham Trail underneath the bridge between the Lower Parking Lot and the first bridge pier has been re-opened.

 

Transit Service: There is no change to MiWay transit services for Route #26.  Please visit the MiWay website for update at https://www.mississauga.ca/miway-transit/announcements/.

 

Parking at Riverwood Park: The Lower Parking Lot at Riverwood Park has been re-opened.

 

Restoration: Sod, trees and replanted flower beds will be restored at the construction site after bridge work has been completed.

 

Utility Disruptions: Temporary disruptions to utilities (i.e. gas, hydro, water, telecommunications and cable TV) may be experienced.  Every effort will be made to restore service.

Services Affected
Municipal Roadway near the UTM Campus
Maintenance Period
-
Contact Information

For General Inquiries, please call 3-1-1, (905-615-4311 outside City limits) to speak to Customer Service.

From your phone or computing device: https://www.mississauga.ca/contact-us/

 

For Project Information, please contact the 

 

Field Ambassador

Marcela Colangelo

905-330-2913

capital.fieldambassador@mississauga.ca